  • #8685
    Lindsay H.

    Hello!

    I am trying to get the following functionality to work in MxAPS:

    The client runs the scheduler on Monday. The orders are scheduled based on their scheduling rules. 6 of 7 production orders in the system can be made this week. This schedule with the 6 orders should then be locked so that no changes can be made to it. All 6 prod. orders from the locked schedule should now be removed from further generated schedules.

    3 new production orders come in on Tuesday. I rerun the scheduler to get a glimpse of what next week will look like for the 3 new orders, and the 1 from last week. It generates a schedule for these 4 orders ( I like it, approve it, and now they are locked and can no longer be used in other schedules).

    If I rerun the scheduler again on Thursday with 5 new orders, it will start the new schedule after the locked schedules.

     

    My question:

    When I try and create this scenario where I make an order, generate the schedule, lock it, and then create a new generated schedule with a new order, the new schedule contains all of the production orders that exist in the database even if they exist in a locked schedule. Is there a way to get the above functionality?

    Also what is the functionality of the “Locked” field on the “MxAPS Generate a Schedule” page since I can’t seem to get it to actually lock any schedules I used it on.

    Any help would be great!

    #10361
    Terri V.
    Insight Works

    Hello Lindsay,

    Currently locking a schedule refers more to machines instead of locking them in a particular sequence/time.

    At this time, any requirements of locking orders to a date/time perspective to no longer allow it to move requires more customer specifics and handled through a tenant extension.

    Thank you,